 |
When I began, this area was a small office
and a small conference room. Once the separating walls
and doors were gone and everything made
good, it became a large open plan office
space.
|
| |
|
 |
|
| |
Trouble with pesky summer flies coming
through those casement windows and fanlights? These
operable screens I built and installed are just the thing! |
|
|
|
|
 |
This is another kitchen tile job I did in a
Halswell home.
|
|
 |
One of several jobs
following the earthquakes where I removed
the old brick chimney and replaced it with a
tiled area all ready for the new log burner.
|
|
 |
| |
The stained glass windows were recovered
from a church and I was hired to build the
new surround and install it in a Leeston
home. |
|
| |
|
|
|
 |
| |
This is a window seat I built from recycled
Rimu. I also installed double glazing in the
surrounding windows. |
|
|
|
|
|
 |
| |
Sometimes a bathroom doesn't need a total
upgrade. This new vanity and tile splashback
was all that was required to freshen up this
one. |
|
|
 |
| |
This is another example of a post-earthquake
chimney removal. This area used to be two
rooms and where the log burner is was a
hallway. |
| |
|
|